King County: Public will have earlier warning in Green River flooding

  • BY Wire Service
  • Wednesday, July 8, 2009 5:55pm
  • News

The thousands of Green River Valley residents in communities such as Auburn, Kent, Renton and Tukwila will have an additional seven hours’ warning of possible flooding as a result of changes King County has made in how it monitors flows on the Green River.

In response to concerns about ongoing structural concerns at Howard Hanson Dam, King County Flood Warning Center staff will use water release data from the dam, rather than flows observed at a stream gage 30 miles downstream at Auburn, as the basis for their emergency response actions.

“It takes approximately seven hours for water that’s been released from Howard Hanson Dam to flow downstream to Auburn, so switching the data point to dam releases provides us with a significant amount of lead time to help those communities prepare for and respond to high water,” said County Executive Kurt Triplett.

“Measuring flows at Auburn has been our traditional yardstick on the Green River because that gage includes water from tributaries entering the river below the dam,” said King County Flood Control District Supervisor Julia Patterson, whose council district represents Green River Valley cities. “But without the dam’s full flood water storage capacity, it just makes good sense to provide as much early warning as possible of increased water releases from the dam.”

The heightened safety awareness is in response to restrictions on how much water the U.S. Army Corps of Engineers’ flood-control dam can hold in the upper Green River Valley.

The Corps announced in February that storage capacity at the dam would be restricted until engineers could evaluate damage and complete repairs to the right flank of the flood-storage facility that was discovered following the January 2009 flooding.

While the Corps points out there is no immediate danger to people and property below the dam, there is an increased risk of flooding to the Green River Valley below the dam in the event of a major rainstorm or significant snowmelt because of the limited storage capacity.

Using water release data from dam is one of several immediate steps that have been taken to increase the safety of Green River Valley residents.

For example, the King County Flood Warning Center will open sooner than normal when significant rainfall is predicted, to closely monitor conditions on the Green River. Additional staff will be added to the Flood Warning Center to handle any increased work load.

Also, additional two-person flood patrols will be dispatched to areas along the Green River when higher flows are expected to better assess conditions. Flood patrol crews can relay information back to the Flood Warning Center so that managers and county leaders can remain well-informed on conditions.

Finally, King County’s Emergency Operation Center (EOC) is coordinating with the EOC’s of the cities of Auburn, Kent, Renton and Tukwila.

More details and history about Howard Hanson Dam can be found at http://www.nws.usace.army.mil. For more information about how King County and the King County Flood Control District are preparing for and responding to the Howard Hanson Dam situation and for flood planning links to affected cities visit www.kingcounty.gov/floodplans or www.kingcountyfloodcontrol.org.


Talk to us

Please share your story tips by emailing editor@kentreporter.com.

To share your opinion for publication, submit a letter through our website https://www.kentreporter.com/submit-letter/. Include your name, address and daytime phone number. (We’ll only publish your name and hometown.) Please keep letters to 300 words or less.

More in News

Kent Police Chief Rafael Padilla and his command staff will host a community meeting from 6 to 7:30 p.m. Thursday, May 9 at Highline College. COURTESY PHOTO, Kent Police
Kent Police set community meeting for May 9 at Highline College

Topics to include latest news, updates from Police Chief Rafael Padilla and his command staff

t
Sound Transit constructing giant bridge in Kent for light rail

Structure along I-5 stretches more than three football fields in length

t
Medical examiner identifies Kent man killed while lying in street

Tony Vento Houston, 63, died of multiple blunt force injuries after vehicle hit him

t
Kent historian, master gardener Nancy Simpson dies at age 80

Roles included Greater Kent Historical Society president; King County Landmarks commissioner

t
Kent man dies after collision with vehicle while lying in the street

Incident at about 4:06 a.m. Tuesday, April 16 at 132nd Avenue SE and SE 278th Street

t
Kent Police to offer teen academy for students in June

For high school students interested in law enforcement career

Madeline Goldsmith. COURTESY PHOTO
No suspect yet in July 2023 Kent murder of Madeline Goldsmith

Someone fatally shot 18-year-old Kentwood High graduate as she sat in vehicle near Lake Meridian

t
Police bust mother, daughter in Kent for retail crime spree

Two reportedly joined one other woman in 3-state crime ring taking women’s clothing from Lululemon

t
Reith Road in Kent to get two new roundabouts this year

City Council approves $4.28 million bid; project to start in late May or early June

t
Puget Sound Fire’s Teddy Bear Clinic set for May 18 in Kent

Annual event provides free checkups for teddy bears and children

t
Overturned military vehicle causes I-5 backup near Kent, Federal Way

Wednesday, April 10 in northbound lanes near South 272nd Street

t
Kent Police Blotter: March 26 to April 7

Incidents include robberies, burglaries, shooting