TJHS junior Lauren guides a tour group on May 11. Olivia Sullivan/the Mirror

TJHS junior Lauren guides a tour group on May 11. Olivia Sullivan/the Mirror

Federal Way district celebrates new Thomas Jefferson High School | Photos

The original school was built in 1968; new campus opened in fall 2021.

Community members celebrated under the Raider roof of the newly built Thomas Jefferson High School in Auburn on May 11.

Construction of the replacement project broke ground in Dec. 2019 and the new three-story school opened to students, staff and faculty in fall 2021. The school is at 4248 S. 288th St.

On May 11, Federal Way Public Schools (FWPS) hosted a ribbon cutting event to celebrate the new school and welcomed community members to tour the building. Over 100 people gathered in the school’s theatre before enjoying refreshments crafted by the school’s culinary arts programs, with a performance by the school’s orchestra, and embarking on tours of the new spaces.

“Since fall of 2021, scholars have had a chance to explore and take in all that the new building has to offer,” said Superintendent Dani Pfeiffer at the ceremony. “And tonight, we’re welcoming in our community to see the results of their investments in our schools. … This building, while new and fresh, represents longstanding support of a community who believes in out scholars’ future as much as we do.”

The project totaled $115.5 million, including construction, design, permitting fees, furniture and equipment, said Whitney Chiang, chief of communications for FWPS.

The current overall cost for the new Thomas Jefferson High School, including construction, design, permitting fees, furniture, and equipment is $115.5 million. The cost is lower than what was anticipated, she added, and the saved funds allow the district to upgrade the school’s athletic fields.

Funding for the project is from the November 2017 voter approval of the Phase 2 school construction bond.

Originally built in 1968, the previous Thomas Jefferson High School site had mostly outdoor hallways for its 11 buildings and dozens of building access points. The replacement campus now has limited and secured entries to improve safety.

Student speakers at the ribbon cutting noted the previous campus’s cracking concrete, freezing rooms, water leaks and other ailments of the 50-year-old building.

Standout features of the new building include a 400-seat theater, an upgraded gymnasium with a color image screen and scoreboard, and an outdoor courtyard. The building’s open construction allows bright natural light to fill the school’s commons area and hallways.

On the first level, the woodworking shop has an outdoor space for students to work on projects next door to the engineering lab. Digital interactive whiteboards are in every classroom, and each floor offers work bars with seating and electrical outlets and additional “flex” work areas of students to work outside of their traditional classrooms.

The school also now has classrooms for pottery, photography and visual arts, band and orchestra, and a school-based health center. Thomas Jefferson offers 39 Career and Technical Education (CTE) courses.

As tour groups passed hallways decorated with annual senior class photos dating back to the 1960s, several people stopped to point out themselves or their loved ones in the group shots.

Thomas Jefferson High School serves nearly 1,700 students. Community tours will be offered May 17-18. For more information, visit fwps.org/ThomasJefferson.


Talk to us

Please share your story tips by emailing editor@kentreporter.com.

To share your opinion for publication, submit a letter through our website https://www.kentreporter.com/submit-letter/. Include your name, address and daytime phone number. (We’ll only publish your name and hometown.) Please keep letters to 300 words or less.

Examples of student work in the woodshop. Olivia Sullivan/the Mirror

Examples of student work in the woodshop. Olivia Sullivan/the Mirror

Girls volleyball played the first game inside the new Thomas Jefferson gym in fall 2021. Olivia Sullivan/the Mirror

Girls volleyball played the first game inside the new Thomas Jefferson gym in fall 2021. Olivia Sullivan/the Mirror

A tour group looks onto the Thomas Jefferson High School commons space below. Olivia Sullivan/the Mirror

A tour group looks onto the Thomas Jefferson High School commons space below. Olivia Sullivan/the Mirror

Thomas Jefferson High School courtyard. Olivia Sullivan/the Mirror

Thomas Jefferson High School courtyard. Olivia Sullivan/the Mirror

tsr

Thomas Jefferson High School courtyard. Olivia Sullivan/the Mirror

Flex work spaces outside of Thomas Jefferson’s second-floor library. Olivia Sullivan/the Mirror

Flex work spaces outside of Thomas Jefferson’s second-floor library. Olivia Sullivan/the Mirror

More in Northwest

t
Man pleads guilty to 2023 murder in Auburn near Muckleshoot Casino

The defendant was allegedly captured on camera shooting the victim.

t
Auburn man charged with vehicular assault after motorcycle crash in Renton

The man allegedly chased the motorcyclist Dec. 13 before he struck him with his Jeep.

The flooded Cedar River flowing into Lake Washington. Photo by Bailey Jo Josie/Sound Publishing
Tenants’ rights and resources following floods

Washington state law has protections for tenants.

Photos by Bailey Jo Josie/Sound Publishing.
Try Furoshiki: Japan’s eco-friendly way to wrap gifts

In collaboration with the Seattle Consulate-General of Japan and the King County Library System, local residents learned “Fabulous Furoshiki: A New Twist on an Old Idea” at the Woodinville Library.

The mudslide happened on SR-169 the evening of Tuesday, Dec. 16, and one lane remains closed at Renton Public Works crews work on the scene. Image courtesy of the City of Renton.
Maple Valley Highway near I-405 partially closed due to mudslide

The westbound lane on Maple Valley Highway/SR-169 is closed east of the Renton Community Center.

Courtesy Photo, Renton Police
Renton teen pleads guilty to 2024 fatal shooting

The 17-year-old boy pleaded guilty to a manslaughter incident where he accidentally shot his friend.

A breach in the Desimone levee Dec. 15 along the Green River in Tukwila. COURTESY SCREENSHOT/Video, King County Sheriff’s Office
Army Corps assists King County with Green River levee breach

Reduces water flow from Hanson Dam; provides personnel support; super sacks

Flood waters flow over NE 124th Street at West Snoqualmie Valley Road NE outside Duvall, Dec. 9, 2025. (Grace Gorenflo/Sound Publishing)
Carnation, Duvall isolated due to flood waters

The two towns are at risk of becoming “islands” during flooding.

Jones Road near Cedar River has water of the roadway and filling people’s homes from the record-breaking flood. Photo by Bailey Jo Josie/Sound Publishing.
Major Cedar River flooding in Renton beats 1990 record

Residents of the Maplewood neighborhood near SR 169 put up sandbags

Floodwater from the Snohomish River partially covers a flood water sign on Thursday, Dec. 11, 2025 in Snohomish, Washington. (Sound Publishing photo)
Feds approve WA emergency declaration for record flooding

As rivers began to recede, the federal government on Dec. 12 approved… Continue reading

Courtesy Photo, WSP
Man could face vehicular homicide charge after Auburn SR 167 crash

Bonney Lake man, 29, dies in Dec. 11 collision with semi